Sewage treatment plant.
Dewatered sludge cake with dryness above 20%.
NEOFLOC compatible with decanter centrifuge.
Cost effective solution for small to medium loading piles.
Marking penetration depth.
Supervising penetration of ductile iron pipe.
Micropile.
NEOFLOC mixing unit.
Assembled Jack to the main reinforcement.
Lateral view of the assembled jack.
Top view of the assembled jack.
Dry sludge cake produced in industrial water/wastewater treatment plant.
Sludge thickening process using NeoFloc 6650C.
PolyMud slurry produced by mixing with sea water.
PolyMud slurry successfully stabilizing sandy soil.
Reconditioning PolyMud slurry.
Supplying fresh GMud slurry into borehole.
AlfaBond used to increase PolyMud slurry’s suspension capacity.
Diaphragm Wall being stabilized with PolyMud slurry.
GMud Ultra slurry is being retrieved from borehole during concreting.
Grab discharging excavated soil. The slurry keeps the soil almost dry.
CrossGel XG. Latest addition in our product line.
CrossGel XG. De-sanding CrossGel XG slurry.
End product with smooth surface.
Excellent wall finish excavated under PolyMud slurry.
Stabilization achieved evidenced by smooth edges.
Diaphragm Wall constructed 5m away from shoreline, stabilized with G3 System.
Perfect connection between Diaphragm Wall and Buttress Wall.
Diaphragm Wall stabilized with CrossGel XG.
Preparing GelPro slurry.
Executing marine bored piles under G3 System.
PolyMud slurry is being reconditioned directly inside excavation.
Surface compensation basin to maintain slurry hydrostatic pressure.
Smart idea building a surface compensation basin.
G3 System performing under extreme weather conditions.
Sedimentation tank in action. To ensure retrieved slurry is clean.
GMud slurry in action.
GMud slurry used for tunneling work.
Diaphragm Wall anchors being installed with the aid of GMud slurry.
Simplicity of G3 System.